58/117

The World in Images

Logo

Cauca Valley | Spillway of Hidroituango Dam

WI_co221.jpg

This water runs through the spillway of the 225 m high Hidroituango Dam on the Cauca River, forming part of a hydropower project under construction. Operation should have started in late 2018, but a landslide earlier the same year blocked the diversion tunnel. As an emergency measure, the water was led through the power house, causing severe damage there. The dam was completed rapidly, so that the spillway takes all the runoff at the time of the photo, until the start of operation of the power plant.

Location
View on OpenStreetMap
Created
on Monday 8 August 2022 by Martin Mergili
Visits and license
840 visits, CC BY-NC-SA 4.0 DEED license