Cauca Valley | Hidroituango Dam and Reservoir
WI_co216.jpg Cauca Valley | Hidroituango Dam and ReservoirThumbnailsCauca Valley | Hidroituango Dam and Reservoir

This 225 m high embankment dam on the Cauca River is part of a hydropower project under construction. Operation should have started in late 2018, but a landslide earlier the same year blocked the diversion tunnel. As an emergency measure, the water was led through the power house. The dam was completed rapidly, so that the spillway (seen in the foreground of the scene) takes all the runoff at the time of the photo, until the start of operation of the power plant. Also, note the landslide in the background.

Created
Tuesday 9 August 2022 by Martin Mergili in South America / Colombia (981 visits)