The Poilão Dam was completed in 2006, impounding the surface water draining through the Ribeira Seca for the purpose of irrigation. However, after a series of dry years, the reservoir is empty even during the rainy season.
The Poilão Dam was completed in 2006, impounding the surface water draining through the Ribeira Seca for the purpose of irrigation. However, after a series of dry years, the reservoir is empty even during the rainy season.